Find us on Facebook
-
HKW Walsum, Walsum (Germany)
Steam turbine plant (750 MW)Installation of the HP turbine, the IP turbine and the two LP turbines, the generator, the preheater, the feed water tank and miscellaneous auxiliary equipment as well as insulation. -
CCPP T-Power, Tessenderlo (Belgium)
Combined Cycle Power Plant (Single-Shaft, 400 MW)Mechanical and electrical/C&I installation of a HRSG unit, a gas turbine, a generator as well a steam turbine including condenser. Mechanical installation of the auxiliary equipment, the sound enclosures, the fire fighting system as well as insulation. -
CPT DONG Energy, Mongstad (Norway)
Gas-fired CHP Plant (2 x 130 MW)Mechanical and electrical / C&I installation of two gas turbines (type Frame 9E) and two generators as well as auxilliary equipment. Installation of on and off base piping, sound enclosures, air inlet channel, filter house, exhaust-gas diffusor as well as painting. -
CCGT Pego, Pego (Portugal)
CCPP (2 x Single-Shaft, 800 MW)Mechanical and electrical / C&I installation of two gas turbines, two steam turbines, two condensers, two generators and auxiliary equipment as well as insulation and installation of the sound enclosures. -
NUON MAGNUM, Eemshaven (Netherlands)
Boiler PlantE&I-Installation of three HRSG:
Grounding and lighting protection
LV-switchgear in container, batteries
LV-cables
Cable support structures
Transmitters, transducers
Instrumentation and control equipment
Pressure transmission pipes
Heat tracing
Lighting installation
-
Dunamenti G3, Szazholambatta (Hungary)
Boiler PlantE&I-Installation of a HRSG:
Grounding and lighting protection
LV-switchgear in container, batteries
LV-cables
Cable support structures
Transmitters, transducers
Instrumentation and control equipment
Pressure transmission pipes
Heat tracing
Lighting installation
-
CCPP Pont sur Sambre, Pont sur Sambre (France)
Combined Cycle Power Plant (Single-Shaft, 412 MW)ectrical/C&I installation for gas turbine, generator, steam turbine
and auxiliary equipment. Medium voltage cabling. Installation of the
main transformer, the auxiliary transformer and the medium voltage
switchgears. Installation of the diesel standby set and battery cells.
Installation of the aluminium generator bus duct. -
CCPP Kårstø, Tysværvåg (Norway)
Combined Cycle Power Plant (Single-Shaft, 418 MW)Electrical/C&I installation for a CCP plant. Installation of the switch
gear, main transformer, the auxiliary transformer and the medium
voltage switch gears. Installation of the diesel standby set and
battery cells. Installation of the aluminium generator bus duct.
Installation of the entire lighting for turbine hall, boiler and the
outside facilities. -
CCPP Sagunto , Sagunto (Spain)
Combined Cycle Power Plant (3x Single-Shaft, 1200 MW)Electrical/C&I installation for gas turbine, generator, steam turbine
and auxiliary equipment. Medium voltage cabling. Installation of the
main transformer, the auxiliary transformer and the medium voltage
switchgears. Installation of the diesel standby set and battery cells.
Installation of the aluminium generator bus duct. Testing and start-up. -
SCA Hygiene Products, Mannheim (Germany)
Project “Snowflake”Selection of C&I field devices, electrical/C&I planning, mean
voltage switch gear, low-voltage main distribution cabinet,
MCC switch gear, electrical/C&I installation, lighting, cabling of
the telephone system, fire alarm system, climatisation of the
control rooms, cold test and start-up assistance in the range of
the erection of the new bleaching plant. -
FGD Cottam PS, Retford (Great Britain)
Flue gas purification plantElectrical installation of the flue gas purification plant, unit 1. -
XXX-Lutz, Sattledt (Austria)
High-bay storage- Manufacture of the MCC-cabinets and control cabinets
- E/C&I installation, cold test and warm test and site coordination -
CCPP Sagunto , Sagunto (Spain)
Ventilation system for CCP plantElectrical/C&I installation of the ventilation system for three
generating units (400 MW) of a combined cycle power plant. -
Hilti AG, Nendeln (Liechtenstein)
Logistic CentreManufacture of control cabinets, electrical installation, cold test
and functional test for a logistic centre. -
Teich AG, Weinburg (Austria)
Roller plantElectrical installation of plant components including supply of
material for the new roller plant II. -
TenCate Geosynthetics, Linz (Austria)
Spunbonding lineIncrease of capacity of the spunbonding line 1. Engineering of
the entire electrical/C&I plant including manufacture of the
control cabinets, software applications for PLC system,
electrical/C&I installation, start-up and documentation. -
SCA, Aschaffenburg (Germany)
Main rebuild of the paper machine PM 1Electrical/C&I installation including cold test in the course of the
main rebuild of the paper machine PM 1. -
Stahlwerk Carinox, Charleroi (Belgium)
Stainless steel worksElectrical installation of a stainless steel works constisting of:
compensation plant (33kV), electrical/C&I installation, lighting
as well as installation of heating system, climate control system
and ventilation system. -
Papierfabrik Palm, Wörth (Germany)
Paper machine PM 6Electrical/C&I installation of partitons like stock preparation,
constant part, slitter winder, steam and condensate system
including supply of material and manufacture of control cabinets
in the course of the new erection of the paper machine PM 6.