CCPP Sagunto
Scope of Work
Electrical/C&I installation for gas turbine, generator, steam turbine and auxiliary equipment. Medium voltage cabling. Installation of the main transformer, the auxiliary transformer and the medium voltage switchgears. Installation of the diesel standby set and battery cells. Installation of the aluminium generator bus duct. Testing and start-up.
Electrical/C&I installation of the ventilation system for three generating units (400 MW) of a combined cycle power plant.
Location: Sagunto (Spain)