CCPP Knapsack
Scope of Work
Mechanical installation of a steam turbine (HIP+LP) including generator and condenser, two gas turbines including generator as well as installation of the sound enclosures and insulation.
Location: Knapsack (Germany)
ENTABAN
Combined Cycle Power Plant (2 x Single-Shaft, 824 MW)
CCPP Severn Power
Combined Cycle Power Plant (Multi-Shaft, 400 MW)
CCPP Herdecke
Combined Cycle Power Plant (Multi-Shaft, 400 MW)
Coolkeeragh CCGT
Combined Cycle Power Plant (Multi-Shaft, 400 MW)
CHP Öresundsverket
Combined Cycle Power Plant (Multi-Shaft, 800 MW)
CCPP Livorno
Combined Cycle Power Plant (Single-Shaft, 2 x 375 MW)
CCPP Campo de Gibraltar
Combined Cycle Power Plant (Single-Shaft, 3 x 380 MW)
CCPP Palos de la Frontera
Combined Cycle Power Plant (Single-Shaft, 400 MW)
CCPP Timelkam
Combined Cycle Power Plant (Single-Shaft, 412 MW)
CCPP Pont sur Sambre