Sope of Work
Mechanical and electrical / C&I installation for a steam turbine (HIP+LP) including generator and condenser, a gas turbine including generator, gas turbine piping, installation of the sound enclosures, the fire fighting system and auxiliary equipment as well as insulation.
Electrical/C&I installation for a CCP plant. Installation of the switch gear, main transformer, the auxiliary transformer and the medium voltage switch gears. Installation of the diesel standby set and battery cells. Installation of the aluminium generator bus duct. Installation of the entire lighting for turbine hall, boiler and the outside facilities.
Location: Tysværvåg (Norway)