Mondi Packaging
Scope of Work
Replacement of the entire machine drive, replacement of the gears in the gear boxes, replacement of the entire recirculating oil lubrication system as well as replacement of the Clupak-cylinder.
Rebuild/new installation of the steam and condensate system of PM 6 and PM 8
Rebuild/new installation of the complete steam and condensate system of the drier section of the PM 8, installation of the measure and control system as well as the impulse pipes. Dismantling and new installation of the steam joints of the PM 6 as well as installation of the measure and control system and the impulse pipes.
Revision of PM 6 and PM 7
Refurbishment of the HP hoods 1 and 2, manufacture and installation of new brackets, adjustment and replacement of the pneumatic adjusting cylinders as well as check and replacement of cardan joints at the drives of wet section and drier section.
Boiler revision
Revision of the bark boiler, revision of the electric filter at CK II, CK III, the bark boiler and the lime kiln, revision of the evaporation plant as well as revision of CK II and CK III.
Location: Frantschach (Austria)