Scope of Work
Dismantling of the existing board machine from wire section and complete erection of the new BM 1. Piping of the hydraulic and pneumatic control system, the central oil and grease lubrication system as well as installation of the machine-oriented control and instrumentation systems.
Location: Äänekoski (Finland)